Emergency power generation DESIGN
Gerald Spencer, PE is
the AE of Record and/or the
Engineer of
Record (EOR)
for the design and the
construction of many SCIF, Airport Control Towers, Secure Department of State Communications
Centers, FBI Academy fall-out shelter, medical facilities, emergency
operating centers and other emergency operating centers where
operations needed to occur at all times without regard to the commercially
provided infrastructure utilities. Gerald Spencer, PE is the EOR for
the design and the construction of the HVAC systems and the electrical
systems for facilities that are required to be
operational during times when normal power and other utilities are not
available. Gerald Spencer, PE has extensive experience in the
design and the construction installation of diesel
engine, natural gas engine, and turbine engine driven electrical standby
power generators. Much of Gerald Spencer's diesel engine and gas turbine
design and construction experience has been
for Southwestern Bell Telephone Company UPS projects. A natural gas engine
generator was installed at the Brazoria County (TX) jail where Gerald
Spencer was the EOR. The largest
diesel engine generator installation where Gerald Spencer was the EOR for
the design and the construction was two 1250 KVA generators was for the DFW
airport FAA facilities. Gerald Spencer, PE was the EOR for the design
and the construction of the new switchgear and
new controls for four 1350 KVA generators with two parallel 3000 KVA transformers
for the Mission Control Center at NASA-JSC.
1.
ENGINE GENERATOR INSTALLATION DESIGN:
Gerald Spencer, PE has
extensive experience
as the EOR for the design and the
construction installation of all types of emergency power
systems including diesel engine, natural gas engine, and turbine engine
driven electrical standby power generators. (plus one flame fired
thermocouple DC power generation system for an un-manned microwave relay
power station at Ignak, Alaska). Many of these projects had multiple parallel engine
generators that were controlled by programmable controllers. Gerald Spencer,
PE is the EOR
for the design and the
construction of the following engine driven power
generation systems:
No. of Engine KW Each
PROJECT..............................................................................
Generators........... Generator
BOMBAY, INDIA - CONSULATE
.............................................
1....................... 550
NASA BUILDING 32 - LIFE SAFETY SYSTEMS SUPPORT ....1....................... 550
BRIDGETOWN, BARBADOS
EMBASSY...................................
1......................... 50
HPD EOC TROUBLE SHOOTING & PROBLEM SOLVING ....
2........................ 400
DFW - FAA - CONTROL
TOWER..............................................
2...................... 1250
CAPITAL-FAIRFAX TELCO........................................................
4........................ 225
GREENSPOINT DIAL
BUILDING...............................................
2........................ 225
WESTLAND OIL
COMPANY......................................................
2...................... 1000
472 GREENWOOD DIAL
BUILDING..........................................
2........................ 175
SUNSET 781 DIAL
BUILDING.....................................................1..........................750
gas TURBINE
ASHLAND TOLL
BUILDING........................................................
1...................... 225
Beeville Memorial
Hospital.............................................
1....................... 225
Harris County Juvenile Detention Center...............
1....................... 350
South Texas College Of Law............................................
1....................... 150
SWBT Ashland Toll Building............................................
1....................... 125
Brazoria County Detention Center ............................
1......................
800
nat gas
SWBT Cleveland 592 Dial Building..................................
1........................ 75
L’Hotel De France...................................................................
1...................... 300
Holiday Inn Park 10...............................................................
1....................... 300
SWBT 458 Dial Building..........................................................
2....................... 225
Exxon EPRC ................................................................................
4....................... 225
SWBT Whitte Road Info Center.........................................
1......................... 75
SWBT Deer Park 479 Dial Building.....................................
2...................... 150
SWBT 472 Pasadena Dial Building.....................................
2...................... 225
1776 Yorktown - Marathon Oil........................................
1....................... 150
NASA Building 32J - Mist Program....................................
1....................... 500
Bellaire Police Department & EOC.................................
1......................... 75
City of Houston Fire Station No. 56...............................
1........................ 50
NASA-JSC (REMODEL POWER
DISTRIBUTION........................
4.................... 1350
& CONTROLS FOR SPACEFLIGHT MISSION CONTROL CENTER)
TROUBLE SHOOT AND SOLVE PARALLEL ................................2........................350
OPERATING PROBLEMS HPD EOC
2.
Gerald R. Spencer, PE is the EOR fwas
the EOR for the design and the construction
of 21
separate diesel fuel storage systems serving engine generator systems as
follows:
Bombay, India Consulate Building Compound.......... 6,000 gallons
Westland Oil Corporation...................................... 72,000
gallons
SWBT Sunset Dial Building..................................... 9,000 gallons
SWBT Greenspoint Dial Building............................. 2,500 gallons
FAA - DFW Control Tower & TRACON ........... 24,000 gallons
Beeville Memorial Hospital.................................... 24,000
gallons
Harris County Juvenile Detention Center................ 12,000 gallons
South Texas College of Law ....................................4,500 gallons
SWBT Ashland Toll Building................................. 12,000 gallons
SWBT Cleveland 592 Dial Building......................... 4,500 gallons
SWBT Capitol Fairfax 222 Downtown.................. 12,000 gallons
L’Hotel Sofitel.........................................................
6,000 gallons
Holiday Inn Park 10................................................. 4,500
gallons
SWBT 458 Dial Building.......................................... 4,500
gallons
Exxon EPRC Standby Fuel System......................... 24,000 gallons
SWBT Witte Road Info Center................................. 1,200 gallons
SWBT Deer Park 479 Dial Building.......................... 1,200 gallons
SWBT 472 Pasadena Dial Building........................... 9,000 gallons
Marathon Oil............................................................
4,500 gallons
NASA Building 32J - Mist Program........................ 12,000 gallons
Bellaire Police Department & EOC........................... 6,000 gallons
City of Houston Fire Station No. 56 .............................500 gallons
3.
SITE POWER
DISTRIBUTION:
Gerald Spencer, PE is the EOR
for the design and the
construction of new commercial projects where the local
power company designs and installs the electrical service and also for
federal government and military modifications and additions. Gerald
Spencer, PE is the EOR
for the design and the
construction of more than 60
primary voltage power distribution projects
including the following electrical primary distribution and street lighting
design projects:
3.1.
NASA-White Sands Testing Facility, repaired and up-graded 29KV
primary distribution (35KV class de-rated for altitude) and street lighting
systems, 1998.
3.2.
NASA-JSC, repaired/replaced overhead 12.47KV distribution and street
lighting system in Area 200/300, 1999.
3.3.
NASA-JSC Building 30S, upgraded 12.47KV primary service to
accommodate Mission Control Center UPS systems, 1999.
3.4.
U S Navy, Ingleside Naval Station, TX, Fleet Mine Warfare Center,
designed 12KV electrical primary distribution system and street lighting
modifications to serve a new 87,000 SF teaching/training facility and a new
6,500 SF secure communications and data processing facility 1997.
3.5.
U S Navy, Corpus Christi Naval Air Station, TX, Remodel Hanger 42 for
Mine Warfare Helicopter Maintenance & storage. 1998
3.6.
U S Navy, Corpus Christi Naval Air Station, TX, ASRM facility for
training Mine Warfare Helicopter crewmen. 1998
3.7.
U S Navy, Corpus Christi Naval Air Station, TX, New Vehicle
maintenance facility for Mine Warfare Vehicle Maintenance. 1999
3.8.
NASA-JSC Building 30, replaced the electrical service to accommodate
the addition of one 1350 KVA engine generator, performed short circuit fault
calculations for each of the possible operating conditions and performed
breaker/fuse coordination studies, 1994.
3.9.
NASA-JSC, determined site electrical service reliability to
electronic data processing equipment and redundancy requirements using the
U.S. Army Reliability Report Requirements for Communications Networks.
3.10.
U.S. Army Corps of Engineers, White Sands Missile Range, modernized
two ueph buildings
1998 |