Gerald Spencer, P.E. has more than 50 years experience serving as the Engineer of Record responsible for the design and construction of the MEP portions of more than 1300 building construction projects since 1968 including more than 30 years of preparing forensic engineering reports. Gerald Spencer, P.E. has also been providing licensed professional engineering expert opinion and testimony concerning HVAC, electrical, plumbing, cryogenics, ventilation, construction contract compliance, construction cost  estimating, construction contract acquisition, construction contract administration, and other construction matters for attorneys with  since 2001.


PREVENTATIVE MAINTENANCE PLANS AND MANUALS


Spencer Engineers, Inc. prepares operation & maintenance manuals for projects that have other than normal operating and maintenance procedures. Normal projects without complicated operating or complicated maintenance procedure requirements can be documented by the construction contractor. SEI specifications always include a maintenance program outline, operational program outline, and other scope requirements so that the contractor fills in the blanks with the equipment that he selects to install, and submits the completed data for the AE review. SEI has extensive experience reviewing contractor prepared O&M plans and manuals. SEI mechanical and electrical engineers are hands-on experienced with analyzing existing HVAC systems, diagnosing operational problems, and proposing long term and short term solutions to these problems. Our staff of engineers (and architects) is particularly well acquainted in building operations and communicates very well with operating and maintenance personnel. You will find that our staff is at home with tools and instruments, as compared to the clean hands ivory tower type of engineer. This attitude generally shows through and makes our personnel more compatible with your operating and maintenance personnel. We always take the time to explain any changes in operating and maintenance procedures to your personnel so that they will fully understand and believe in any procedures that we recommend.


libraries



Libraries must have HVAC systems with very close humidity control in order to prevent mold on the books. Gerald R. Spencer, P.E. is the Engineer of Record for the design and the construction of the following Libraries:

Wichita Falls Library - Wichita Falls, Texas Bellaire Library Addition - Bellaire, Texas Spring Branch Library - Houston, Texas Bellville Library - Bellville, Texas


EXXON PRODUCTION RESEARCH LAB BUILDING


In 1976, We performed an analysis of the HVAC system and recommended energy conservation measures such as Variable Volume Chemical Hood Exhaust, Chilled Water Reheat for OSA Make-up, and several other unique HVAC modifications for that project.we performed a study to determine why the plant chilled water would not circulate the water to the buildings properly, and then prepared drawings to correct the piping so that the piping would flow to the buildings in the quantity needed.Type your paragraph here.