Gerald Spencer, P.E. has more than 50 years experience serving as the Engineer of Record responsible for the design and construction of the MEP portions of more than 1300 building construction projects since 1968 including more than 30 years of preparing forensic engineering reports. Gerald Spencer, P.E. has also been providing licensed professional engineering expert opinion and testimony concerning HVAC, electrical, plumbing, cryogenics, ventilation, construction contract compliance, construction cost  estimating, construction contract acquisition, construction contract administration, and other construction matters for attorneys with  since 2001.



office buildings



Gerald Spencer, P.E. is the MEP Engineer of Record for the design of many office buildings as follows:

1. OFFICE BUILDING FOR CHERRYBROOK CORPORATION, GRAND PARK VILLAGE - HOUSTON, TEXAS - 2-story, concrete slab-on-grade, steel framed, masonry exterior wall, steel stud GWB partitions, air conditioning.

2. OFFICE BUILDING FOR WICHITA FALLS SAVINGS ASSN. - WICHITA FALLS, TEXAS - Rehabilitation of ground floor of existing 4-story building, added 1 story (16' ceiling height) banking lobby, parking area and planting, air conditioning.

3. OFFICE BUILDING AND LABORATORY FOR SOUTHERN MICROFILM CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade, wood framed load bearing exterior masonry walls, wood stud GWB partitions, air conditioning.

4. OFFICE BUILDING AND SERVICE CENTER FOR HOUSTON LIGHTING AND POWER COMPANY - WHARTON, TEXAS - 1-story, concrete slab-on-earth fill(truck bed height), steel frame. Office has masonry exterior walls, steel stud GWB partitions, coal-tar pitch built up roof. Warehouse has insulated metal panels, walls and roof. zoned air conditioning.

5. OFFICE BUILDING AT PLANT FOR PENNWALT CHEMICALS CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade, steel framed, special Pennwalt coating on exterior exposed steel, masonry exterior walls, steel stud GWB partitions, air conditioning.

6. OFFICE BUILDING FOR COMPRESSOR ENGINEERING CORP. - HOUSTON, TEXAS - Job cast concrete tilt-up load bearing exterior walls, concrete foundation and floors, interior steel frame and joists, 100% zoned air conditioning.

7. OFFICE BUILDING ADDITION FOR WESTLAND OIL DEVELOPMENT CORPORATION - HOUSTON, TEXAS - 1-story addition to existing 1-story building, concrete slab-on-grade, steel framed, masonry exterior walls, steel stud GWB partitions, air conditioning.

8. SOUTH TEXAS COLLEGE OF LAW 11 FLOOR TOWER ADDITION - HOUSTON, TX - MEP Consultant - Designed mechanical, electrical and plumbing for 11 story office and classroom tower with auditorium addition. Top three floors house the state civil appeals `

9. WESTLAND OIL HEADQUARTERS - 4 STORY - CONROE, TEXAS - MEP Consultant - This is a first class office building with health club, restaurant, atrium, etc.

10. DUPONT - ADMINISTRATION BUILDING ADDITION - LAPORTE, TEXAS - MEP Consultant

11. NASSAU BAY BANK AND OFFICE BLDG - MEP Consultant - Clear Lake, Texas 2 story - 50,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

12. FIRST NAT'L BANK OF BELLAIRE TEXAS - MEP Consultant - 2 story - 50,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

13. PRODUCTION OPERATORS HOUSTON, TEXAS - MEP Consultant - 2 story - 70,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

14. LUTHERAN PROFESSIONAL OFFICE BLDG AND PARKING GARAGE - SAN ANTONIO, TEXAS - MEP Consultant - 6 Story - 120,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

15. WESTLAND OIL OFFICE - CONROE, TEXAS - MEP Consultant - 4 story - 90,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.16. PRUDENTIAL OFFICE - KANSAS CITY, KANSAS - MEP Consultant - 6 story - 120,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

17. PRUDENTIAL OFFICE - SAN ANTONIO, TEXAS - MEP Consultant - 2 story - 40,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

18. HOUSTON AREA TEACHERS CREDIT UNION - MEP Consultant - 8 Story 160,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

19. PARAGON CENTER OFFICE - TAMPA, FLORIDA - MEP Consultant - 9 story - 180,000 sf plus parking garage - We designed the HVAC, Electrical and Plumbing systems for this facility.

20. KENNEDY CENTER OFFICE - TAMPA, FLORIDA - MEP Consultant - 4 story - 80,000 sf and parking garage - We designed the HVAC, Electrical and Plumbing systems for this facility.

21. MARATHON OIL OFFICE - HOUSTON, TEXAS - MEP Consultant - 8 Story - 160,000 sf plus parking garage - We designed the HVAC, Electrical and Plumbing systems for this facility.

22. ENTERPRISE BANK HOUSTON - MEP Consultant - 6 Story 100,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

23. BUCKLEY OFFICE BUILDING - MEP Consultant - 4 Story - 80,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

24. LOOP 610 OFFICE BUILDING - MEP Consultant - 6 Story & Park Garage - 160,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

25. EXXON PRODUCTION RESEARCH CO. WALTERS BLDG. MODIFICATIONS - HOUSTON, TEXAS - Converted an existing two story office building into office for EPRC.

26. OFFICE BUILDING FOR CHERRYBROOK CORPORATION, GRAND PARK VILLAGE - HOUSTON, TEXAS - 2-story, concrete slab-on-grade, steel framed, masonry exterior wall, steel stud GWB partitions, air conditioning.

27. OFFICE BUILDING AND LABORATORY FOR SOUTHERN MICROFILM CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade, wood framed load bearing exterior masonry walls, wood stud GWB partitions, air conditioning.

28. OFFICE BUILDING AND SERVICE CENTER FOR HOUSTON LIGHTING AND POWER COMPANY - WHARTON, TEXAS - 1-story, concrete slab-on-earth fill(truck bed height), steel frame. Office has masonry exterior walls, steel stud GWB partitions, coal-tar pitch built up roof. Warehouse has insulated metal panels, walls and roof. zoned air conditioning.

29. OFFICE BUILDING AT PLANT FOR PENNWALT CHEMICALS CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade, steel framed, special Pennwalt coating on exterior exposed steel, masonry exterior walls, steel stud GWB partitions, air conditioning.

30. OFFICE BUILDING FOR COMPRESSOR ENGINEERING CORP. - HOUSTON, TEXAS - Job cast concrete tilt-up load bearing exterior walls, concrete foundation and floors, interior steel frame and joists, 100% zoned air conditioning.

31. OFFICE BUILDING ADDITION FOR WESTLAND OIL DEVELOPMENT CORPORATION - HOUSTON, TEXAS - 1-story addition to existing 1-story building, concrete slab-on-grade, steel framed, masonry exterior walls, steel stud GWB partitions, air conditioning.

32. DUPONT - ADMINISTRATION BUILDING ADDITION - LAPORTE, TEXAS - MEP Consultant33. NASSAU BAY BANK AND OFFICE BLDG - MEP Consultant - Clear Lake, Texas 2 story - 50,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.34. FIRST NAT'L BANK OF BELLAIRE TEXAS - MEP Consultant - 2 story - 50,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

35. PRODUCTION OPERATORS HOUSTON, TEXAS - MEP Consultant - 2 story - 70,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

36. LUTHERAN PROFESSIONAL OFFICE BLDG AND PARKING GARAGE - SAN ANTONIO, TEXAS - MEP Consultant - 6 Story - 120,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

37. PRUDENTIAL OFFICE - SAN ANTONIO, TEXAS - MEP Consultant - 2 story - 40,000 sf - We designed the HVAC, Electrical and Plumbing systems for this facility.

38. FIRST NATIONAL BANK OF PEARLAND - PEARLAND, TEXAS - One story (10,000 S.F.) banking facility with drive-in lanes. Project included interior design and programming, in addition to the architectural contract.

39. JONES SUPPLY COMPANY - HOUSTON, TEXAS - A combination two story office building and a high bay warehouse to house piping and plumbing fixtures. John Smith personal experience.

40. EXXON PRODUCTION RESEARCH CO. WALTERS BLDG. MODIFICATIONS - HOUSTON, TEXAS - Converted an existing two story office building into office for EPRC.