OFFICE BUILDINGS
Gerald Spencer,
P.E. is the MEP Engineer of Record for the design of many office buildings as
follows:
1.
OFFICE BUILDING FOR CHERRYBROOK
CORPORATION, GRAND PARK VILLAGE - HOUSTON, TEXAS - 2-story, concrete
slab-on-grade, steel framed, masonry exterior wall, steel stud GWB partitions,
air conditioning.
2.
OFFICE BUILDING FOR WICHITA FALLS
SAVINGS ASSN. - WICHITA FALLS, TEXAS - Rehabilitation of ground floor of
existing 4-story building, added 1 story (16' ceiling height) banking lobby,
parking area and planting, air conditioning.
3.
OFFICE BUILDING AND LABORATORY FOR
SOUTHERN MICROFILM CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade,
wood framed load bearing exterior masonry walls, wood stud GWB partitions, air
conditioning.
4.
OFFICE BUILDING AND SERVICE CENTER
FOR HOUSTON LIGHTING AND POWER COMPANY - WHARTON, TEXAS - 1-story, concrete
slab-on-earth fill(truck bed height), steel frame. Office has masonry exterior
walls, steel stud GWB partitions, coal-tar pitch built up roof. Warehouse has
insulated metal panels, walls and roof. zoned air conditioning.
5.
OFFICE BUILDING AT PLANT FOR
PENNWALT CHEMICALS CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade,
steel framed, special Pennwalt coating on exterior exposed steel, masonry
exterior walls, steel stud GWB partitions, air conditioning.
6.
OFFICE BUILDING FOR COMPRESSOR
ENGINEERING CORP. - HOUSTON, TEXAS - Job cast concrete tilt-up load bearing
exterior walls, concrete foundation and floors, interior steel frame and joists,
100% zoned air conditioning.
7.
OFFICE BUILDING ADDITION FOR
WESTLAND OIL DEVELOPMENT CORPORATION - HOUSTON, TEXAS - 1-story addition to
existing 1-story building, concrete slab-on-grade, steel framed, masonry
exterior walls, steel stud GWB partitions, air conditioning.
8.
SOUTH TEXAS COLLEGE OF LAW 11
FLOOR TOWER ADDITION - HOUSTON, TX - MEP Consultant - Designed mechanical,
electrical and plumbing for 11 story office and classroom tower with auditorium
addition. Top three floors house the state civil appeals courts.
9.
WESTLAND OIL HEADQUARTERS - 4
STORY - CONROE, TEXAS - MEP Consultant - This is a first class office building
with health club, restaurant, atrium, etc.
10.
DUPONT - ADMINISTRATION BUILDING
ADDITION - LAPORTE, TEXAS - MEP Consultant
11.
NASSAU BAY BANK AND OFFICE BLDG -
MEP Consultant - Clear Lake, Texas 2 story - 50,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
12.
FIRST NAT'L BANK OF BELLAIRE TEXAS
- MEP Consultant - 2 story - 50,000 sf - We designed the HVAC, Electrical and
Plumbing systems for this facility.
13.
PRODUCTION OPERATORS HOUSTON,
TEXAS - MEP Consultant - 2 story - 70,000 sf - We designed the HVAC, Electrical
and Plumbing systems for this facility.
14.
LUTHERAN PROFESSIONAL OFFICE BLDG
and parking garage - San Antonio, Texas
- MEP Consultant - 6 Story - 120,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
15.
WESTLAND OIL OFFICE - CONROE,
TEXAS - MEP Consultant - 4 story - 90,000 sf - We designed the HVAC, Electrical
and Plumbing systems for this facility.
16.
PRUDENTIAL OFFICE - KANSAS CITY,
KANSAS - MEP Consultant - 6 story - 120,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
17.
PRUDENTIAL OFFICE - SAN ANTONIO,
TEXAS - MEP Consultant - 2 story - 40,000 sf - We designed the HVAC, Electrical
and Plumbing systems for this facility.
18.
HOUSTON AREA TEACHERS CREDIT UNION
- MEP Consultant - 8 Story 160,000 sf - We designed the HVAC, Electrical and
Plumbing systems for this facility.
19.
PARAGON CENTER OFFICE - TAMPA,
FLORIDA - MEP Consultant - 9 story - 180,000 sf plus parking garage - We
designed the HVAC, Electrical and Plumbing systems for this facility.
20.
KENNEDY CENTER OFFICE - TAMPA,
FLORIDA - MEP Consultant - 4 story - 80,000 sf and parking garage - We designed
the HVAC, Electrical and Plumbing systems for this facility.
21.
MARATHON OIL OFFICE - HOUSTON,
TEXAS - MEP Consultant - 8 Story - 160,000 sf plus parking garage - We designed
the HVAC, Electrical and Plumbing systems for this facility.
22.
ENTERPRISE BANK HOUSTON - MEP
Consultant - 6 Story 100,000 sf - We designed the HVAC, Electrical and Plumbing
systems for this facility.
23.
BUCKLEY OFFICE BUILDING - MEP
Consultant - 4 Story - 80,000 sf - We designed the HVAC, Electrical and Plumbing
systems for this facility.
24.
LOOP 610 OFFICE BUILDING - MEP
Consultant - 6 Story & Park Garage - 160,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
25.
EXXON
PRODUCTION RESEARCH CO. walters bldg. MODIFICATIONS - HOUSTON, TEXAS -
Converted an existing two story office building
into office for EPRC.
26.
OFFICE BUILDING FOR CHERRYBROOK
CORPORATION, GRAND PARK VILLAGE - HOUSTON, TEXAS - 2-story, concrete
slab-on-grade, steel framed, masonry exterior wall, steel stud GWB partitions,
air conditioning.
27.
OFFICE BUILDING AND LABORATORY FOR
SOUTHERN MICROFILM CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade,
wood framed load bearing exterior masonry walls, wood stud GWB partitions, air
conditioning.
28.
OFFICE BUILDING AND SERVICE CENTER
FOR HOUSTON LIGHTING AND POWER COMPANY - WHARTON, TEXAS - 1-story, concrete
slab-on-earth fill(truck bed height), steel frame. Office has masonry exterior
walls, steel stud GWB partitions, coal-tar pitch built up roof. Warehouse has
insulated metal panels, walls and roof. zoned air conditioning.
29.
OFFICE BUILDING AT PLANT FOR
PENNWALT CHEMICALS CORP. - HOUSTON, TEXAS - 1-story, concrete slab-on-grade,
steel framed, special Pennwalt coating on exterior exposed steel, masonry
exterior walls, steel stud GWB partitions, air conditioning.
30.
OFFICE BUILDING FOR COMPRESSOR
ENGINEERING CORP. - HOUSTON, TEXAS - Job cast concrete tilt-up load bearing
exterior walls, concrete foundation and floors, interior steel frame and joists,
100% zoned air conditioning.
31.
OFFICE BUILDING ADDITION FOR
WESTLAND OIL DEVELOPMENT CORPORATION - HOUSTON, TEXAS - 1-story addition to
existing 1-story building, concrete slab-on-grade, steel framed, masonry
exterior walls, steel stud GWB partitions, air conditioning.
32.
DUPONT - ADMINISTRATION BUILDING
ADDITION - LAPORTE, TEXAS - MEP Consultant
33.
NASSAU BAY BANK AND OFFICE BLDG -
MEP Consultant - Clear Lake, Texas 2 story - 50,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
34.
FIRST NAT'L BANK OF BELLAIRE TEXAS
- MEP Consultant - 2 story - 50,000 sf - We designed the HVAC, Electrical and
Plumbing systems for this facility.
35.
PRODUCTION OPERATORS HOUSTON,
TEXAS - MEP Consultant - 2 story - 70,000 sf - We designed the HVAC, Electrical
and Plumbing systems for this facility.
36.
LUTHERAN PROFESSIONAL OFFICE BLDG
and parking garage - San Antonio, Texas
- MEP Consultant - 6 Story - 120,000 sf - We designed the HVAC,
Electrical and Plumbing systems for this facility.
37.
PRUDENTIAL OFFICE - SAN ANTONIO,
TEXAS - MEP Consultant - 2 story - 40,000 sf - We designed the HVAC, Electrical
and Plumbing systems for this facility.
38.
FIRST
NATIONAL BANK OF PEARLAND - PEARLAND, Texas -
One story (10,000 S.F.) banking facility with
drive-in lanes. Project included interior design and programming, in addition
to the architectural contract.
39.
JONES
SUPPLY COMPANY - Houston, Texas - A
combination two story office building and a high bay warehouse to house piping
and plumbing fixtures. John Smith personal experience.
40.
EXXON
PRODUCTION RESEARCH CO. walters bldg. MODIFICATIONS - HOUSTON, TEXAS -
Converted an existing two story office building
into office for EPRC.
|